The Cottage

Tamarack´s blog for the collaboration and construction of the Burback residence.

excavated crawl space and foundation installed

Here are some recent photographs.

burback1

Our foundation is going in, we added additional fly ash to our cement mix from Glacier. Fly ash is a residue from coal combustion and can be recycled/substituted for Portland Cement in cement mix.

burback2

Published by Ryan Zygar in The Cottage on May 15, 2008 at 2:10 pm. Leave a comment »

master bedroom & great room

Images of how the master bedroom will feel with edits to the window on the South Wall.

masterbedroom1

Fireplace on the East Wall of great room @ 42″ firebox. Just the massing in the room with the mantle to be similar to the lower image.

fireplace421
amhurst1

Published by Ryan Zygar in The Cottage on May 8, 2008 at 11:49 am. Leave a comment »

updated engineering

We revised our engineering to reflect header sizes, stud spacing and additional room required to make the entry way “feel”.

The header and stud spacing will be more efficient with our lumber order and energy conscious with our design. The cavity where a beam would normally take up space can now be utilized with additional insulation. The stud spaced further apart allow for less wood and additional insulation.

We our installing straps at our foundation stem walls in lieu of all thread. Jason, of Kaski Concrete, Inc., suggested this method when discussing possible alternatives to evaluate our LEED goal.

Download the update engineering plans here

Published by Ryan Zygar in The Cottage on May 5, 2008 at 11:48 pm. Leave a comment »

site plan, address correction & submitted for permit

Today we submitted for permit. We anticipate a quick turn around. Three builders have started construction on there respective lots. The Parade of Homes will have 5 builders for 2008.

The address for the project is:

12211 NW 48TH CT, VANCOUVER, 98685

HERE IS OUR ANTICIPATED SITE PLAN:

lot22siteplanimage

Published by Ryan Zygar in The Cottage on May 5, 2008 at 11:07 pm. Leave a comment »

general feel of house

Influential Elevations

Published by Ryan Zygar in The Cottage on April 15, 2008 at 1:51 pm. Leave a comment »

Our Story | Portfolio | The Experience | Contact | Partners

WASHINGTON license # TAMARDC931JE, TAMARH*935JF, OREGON CCB # 152987 | ©2008 Tamarack Corporation